I.Product Overview
The charging equipment assembly and commissioning intelligent training platform is composed of the new national standard 7KW AC cabinet charging pile and the special test load box for charging pile. It is specially developed for training charging pile assembly, debugging and after-sales maintenance technicians. The charging pile has the function of repeated disassembly and assembly, and all accessories can be quickly positioned, assembled and debugging. Simple operation, high efficiency, charging pile and charging pile load device used together, with charging test function, can automatically verify the correctness of assembly, assembly performance of effective testing and inspection, charging pile bottom strengthened to enhance stability. Through the charging pile assembly debugging practice,students can master the connection control relationship between the core components of AC charging pile; Cultivate students' ability to assemble and debug AC charging piles and their ability to analyze and deal with faults.
II.Product Function
- The charging pile adopts cabinet structure, and the support below is reinforced.
- After connecting and debugging the charging pile, the charging plug is connected to the vehicle end of its own national standard AC charging socket, and the correctness of the wiring can be verified.
- The charging pile has perfect safety protection function, with input side over-voltage, under-voltage protection, output side over-voltage, over-current protection, over-temperature, short circuit, leakage, lightning protection and other protection.
- The man-machine interface on the front of the charging pile can dynamically display real-time charging voltage, charging current, charging quantity, charging time and other information.
- With charging, emergency stop button switch, connection confirmation detection, charging door detection, charging gun lock, charging temperature detection and other functions to ensure charging safety.
III.Technical parameters
1. Dimensions (mm) : 750*500*1600 (long * wide * high charging pile) +600*750*960 (long * wide * high load box)
2. Input power supply: AC220V±15% 50Hz
3. Rated output voltage: AC220V±15% 50Hz
Rated output power: 7KW
Output rated current: 32A
4. Overcurrent protection: 35.2A
5. Overvoltage protection ≥264Vac
6. Undervoltage protection ≤176Vac
7. Leakage protection action current 30mA
8. Watt-hour meter 2.0 multifunctional AC watt-hour meter
9. Working environment
Temperature: -20℃ ~ +50℃
Relative humidity: 5% ~ 95%
Altitude: ≤1000m
10. Protection level: IP54
11. Lifetime: 10000 times
IV.Training Purpose
1. Understand the structure principle of AC charging pile.
2. Understand the function of main parts of AC charging pile.
3. Master the selection method of charging pile wiring harness and accessories.
4. Master power line selection, cold press terminal selection and crimping process.
5. Master the test method of wire harness connection correctness.
6. Master the measuring method of insulation resistance value of charging pile.
7. Master the distinguishing method of L-line and N-line.